SMOOTH ROCK FALLS SITE REHABILITATION
PROJECT DESCRIPTION
-
During the first year of operations, one of the major jobs was removing the bark on the ridge
-
The remaining bark was then contoured into the ridge
-
The second year of operations, the major tasks were to fill in depressions in the ridge, level out the surface, and cover the ridge with a clay capping
-
In the third year of operations, the major tasks were covering the ridge in topsoil and hydroseeding
TIME FRAME
3 Years (2018 - 2020)
LOCATION
Smooth Rock Falls
Heritage Bark Pile